NEW ROOFS · EAST COWES

Hipped roof replacement in East Cowes

WWR Roofing stripped the original red plain tiles during this hipped roof replacement in East Cowes, Isle of Wight. The photographs show the early stages of the work, with new breathable roofing membrane and timber tile battens across the prepared slope.

Service
New roofs
In the photographs
Tile stripping, breathable membrane and tile battens
View the project photographs
Blue breathable roofing membrane and new timber tile battens fitted across the hipped roof slope.
Blue breathable roofing membrane and new timber tile battens fitted across the hipped roof slope.

Stripping the existing plain tiles

The first aerial view shows the original red plain tiles across the hipped roof. Hip and ridge tiles mark the junctions between the slopes, with a conservatory and lower flat roof alongside the house.

During stripping, the closely spaced existing battens become visible beneath the plain tiles. The photographs show this work progressing one section at a time, with tiles still in place on adjacent slopes.

Breathable membrane and new tile battens

The prepared slope has a blue breathable roofing membrane beneath new horizontal timber tile battens. The membrane laps and the batten runs are visible from the eaves towards the ridge.

The overhead views show three stages together: remaining plain tiles, an exposed slope with its old battens, and the section with new membrane and battens ready for tiling. These photographs record preparation before the replacement roof tiles are laid.

Project photographs

Select a photograph to view it in full.

Existing red plain tiles with hip and ridge tiles on the East Cowes roof before stripping.
01Existing red plain tiles with hip and ridge tiles on the East Cowes roof before stripping.
Red plain tiles being stripped from the pitched roof, exposing the closely spaced timber tile battens.
02Red plain tiles being stripped from the pitched roof, exposing the closely spaced timber tile battens.
Blue breathable roofing membrane and new timber tile battens fitted across the hipped roof slope.
03Blue breathable roofing membrane and new timber tile battens fitted across the hipped roof slope.
Roof stripping in stages: remaining plain tiles, exposed old battens and a slope with new membrane and battens.
04Roof stripping in stages: remaining plain tiles, exposed old battens and a slope with new membrane and battens.
Overhead view of the breathable membrane laps and new tile battens running across the prepared roof slope.
05Overhead view of the breathable membrane laps and new tile battens running across the prepared roof slope.

YOUR ROOFING PROJECT

Planning work on your roof?

Tell us about your home and the roofing work you need. We’ll help you take the next step.